Willow Kitchen & Bath Remodeling

2026 prices

Three Bathroom Packages, Three Kitchen Packages, Real Prices

Bathrooms from $12,000, kitchens from $15,000, tub-to-shower from $7,500, all under CSLB license #1127360. Most jobs fit one of these packages; your written estimate itemizes the same lines for your house.

Call (650) 507-4525 Get an Estimate

Bathroom Remodeling packages

Hall Bath Refresh

from$12,000

2 weeks

A sound hall bath where the toilet, tub and vanity stay where they are.

  • Demolition to the studs at the wet wall, haul-away
  • New valve in the existing location
  • Waterproofed tub surround or shower walls in porcelain tile
  • Stock vanity with quartz top
  • WaterSense toilet, faucet and showerhead
  • Exhaust fan to code, GFCI outlets, paint

Not included: Moving the drain, toilet or vanity; Glass enclosure (shower curtain rod included).

Full Bathroom Remodel

from$16,000

2–3 weeks

A hall or guest bath where the layout, valve or drain moves.

  • Everything in the Refresh
  • Plumbing moves within the room
  • Tub-to-shower or shower-to-tub swap with frameless glass
  • Semi-custom vanity, niche, new floor tile
  • Vanity light, recessed can, dimmer
  • Permit and inspections

Not included: Fixtures above allowance; Repairs to hidden rot, priced in writing before we fix it.

Primary Bathroom

from$25,000

4–6 weeks

Primary suites: double vanity, large shower, often a freestanding tub.

  • Everything in the Full Remodel
  • Curbless or low-curb walk-in shower with linear drain
  • Double vanity, freestanding or drop-in tub
  • Large-format tile, heated floor option
  • New circuits for heated floor and towel warmer
  • Selection meeting with our designer

Not included: Fixtures above allowance; Steam units and custom glass to the ceiling, priced separately.

Line items and city adjustments: bathroom remodel cost. The service in detail: bathroom remodeling.

Kitchen Remodeling packages

Two-Week Kitchen Refresh

from$15,000

2 weeks

Cabinet boxes are sound; counters, backsplash and fronts are tired.

  • Quartz countertops, undermount sink and faucet
  • Tile or slab backsplash
  • Cabinet painting or new doors on existing boxes
  • New hardware, under-cabinet LED lighting
  • Appliance reinstall in the same footprint
  • Paint and final clean

Not included: Moving the sink, range or fridge; New appliances.

Full Kitchen Remodel

from$35,000

4–6 weeks

New cabinets and layout in the existing room.

  • Demolition, new semi-custom or custom cabinets
  • Sink, range and fridge moves within the room
  • Quartz or quartzite counters, full backsplash
  • Dedicated circuits, recessed lighting, Title 24 controls
  • Ducted range hood, kitchen flooring
  • Permit, inspections and appliance installation

Not included: Appliances (we install yours); Wall removal (see Open-Concept).

Open-Concept Kitchen

from$50,000

8–12 weeks

Kitchens where a non-structural wall or soffit comes out to open the room. Load-bearing walls wait for our B license.

  • Everything in the Full Remodel
  • Partition and soffit removal, ceiling and floor patched across the new room
  • Kitchen island with seating, plumbing and power
  • Flooring across the opened room
  • Electrical for induction where the panel allows

Not included: Load-bearing wall removal and beams; Panel or service upgrades, priced separately.

Line items and city adjustments: kitchen remodel cost. The service in detail: kitchen remodeling.

Tub-to-Shower Conversion packages

Acrylic Wall Shower

from$7,500

1 day

The fastest conversion: a seamless acrylic wall system in the tub alcove.

  • Tub removal and haul-away
  • Shower pan sized to the old tub footprint
  • Acrylic walls, no grout lines
  • New pressure-balance valve and showerhead
  • Grab-bar blocking and a shelf
  • Glass door or curtain rod

Not included: Moving the drain; Tile.

Tiled Walk-In Shower

from$13,000

5 days

A tile shower in the tub alcove with a low curb and frameless glass.

  • Tub removal, new pan, drain centered or linear
  • Waterproofing membrane, flood-tested before tile
  • Porcelain wall and floor tile, recessed niche
  • Valve with handheld on a slide bar
  • Frameless glass panel or door
  • Permit where the drain or valve moves

Not included: Fixtures above allowance.

Curbless Shower

from$16,000

7–10 days

No curb: for aging in place, wheelchairs or a seamless floor.

  • Everything in the Tiled Walk-In
  • Floor recessed so it runs flat into the shower
  • Linear drain
  • Large-format floor tile continuous with the bathroom
  • Fold-down seat and grab bars on blocking
  • Permit and inspections

Not included: Bathroom floor outside the shower area, unless quoted.

Line items and city adjustments: tub-to-shower conversion cost. The service in detail: tub-to-shower conversion.

How the fixed price works

  1. Site visit the same week you call.
  2. Written estimate within 48 hours: every line, every allowance.
  3. The price holds for 30 days. Sign within that and it is your contract price.
  4. Change orders only in writing, priced before the work. That includes hidden damage we find behind a wall.

Payment schedule

California law caps the down payment on a home improvement contract at $1,000 or 10% of the contract price, whichever is less. After that, you pay as work is completed:

Deposit of $1,000 or 10%, whichever is less, at signing. 40% when demolition is done and rough plumbing and electrical pass inspection. 40% when tile and cabinets are installed. The balance at the final walk-through, once you have signed off.

Your ballpark

Ballpark estimator

What would yours cost?

1. Room
2. Size and scope
Starts at—

A range from our published packages, before a site visit. Your written estimate sets the exact price.

Send me the detailed estimate

Get a written estimate in 48 hours

Tell us about the room. We visit the same week, measure, and send a written, itemized estimate within 48 hours.

Call (650) 507-4525

We answer within 10 minutes, Mon–Sat 7 AM–7 PM.