Remodeling Guides for Peninsula Homeowners
What we explain at site visits, written down: how permits work in your city, what an Eichler changes, how long the work takes and what to keep.
Call (650) 507-4525 Get an Estimate
- ★ 5.0 · 27 Google reviews
- Licensed, bonded, insured
- Based in Palo Alto
- Since 2018
Permits
- Menlo Park Remodel Permits: City Streets vs County Streets
A Menlo Park address does not mean a city permit. How to check your parcel, and the city and San Mateo County rules for kitchen and bath remodels. - Kitchen and Bathroom Remodel Permits in Palo Alto
What needs a permit in Palo Alto, the Kitchen/Bath Instant Permit, fees, inspections, SB 407, CPAU rebates, historic homes and Stanford land.
Bathroom Remodeling
- How to Remodel an Eichler Bathroom Without Wrecking It
Remodeling an Eichler bathroom means working with a radiant slab, post-and-beam walls and no attic. What to keep, what to change and what it costs. - How Long a Bathroom Remodel Takes, Week by Week
A bathroom remodel takes 2 weeks for a refresh, 2–3 for a full hall bath and 4–6 for a primary bath, plus design, ordering and permit time first.
Kitchen Remodeling
- Remodeling an Eichler Kitchen
How to remodel an Eichler kitchen around a radiant slab, post-and-beam ceiling and open plan: layout, cabinets, induction, lighting and cost.
Tub-to-Shower Conversion
- Keep the Tub or Convert to a Shower? What Resale Says
Should you replace your bathtub with a walk-in shower? When removing a tub hurts resale, when it does not, and how to decide for your house.
Get a written estimate in 48 hours
Tell us about the room. We visit the same week, measure, and send a written, itemized estimate within 48 hours.
Call (650) 507-4525 Get an Estimate
We answer within 10 minutes, Mon–Sat 7 AM–7 PM.